NYY / NYY-J / NYY-O PVC 0.6/1kV Power Cable | ||
Voltage: | 0.6/1kV | |
Structure: | Conductor | RE: Class 1 solid copper conductor RM: Class 2 stranded copper conductor |
Insulation | PVC (Polyvinyl Chloride) | |
Jacket | PVC (Polyvinyl Chloride) | |
Feature | Power and control cable |
Power and control cable for fixed installation. Can be used indoors, outdoors, underground, in concrete and in water.
NYY-O (without Green/Yellow earth conductor) also available
0.6/1kV
Fixed: -15ºC to +70ºC
Flexed: -5ºC to +50ºC
Fixed: 12 x overall diameter
IEC 60502-1, VDE 0276-603, HD 603, IEC 60228
Flame retardant according to IEC/EN 60332-1-2
RE: Class 1 solid copper conductor
RM: Class 2 stranded copper conductor
PVC (Polyvinyl Chloride)
PVC (Polyvinyl Chloride)
PVC (Polyvinyl Chloride)
3 core: Green/Yellow Blue Brown
4 core: Green/Yellow Brown Black Grey
5 core: Green/Yellow Brown Black Grey Blue
7 core and above: Black with White numbers
Black
NO. OF CORES | NOMINAL CROSS SECTIONAL AREA mm2 |
CONDUCTOR TYPE |
NOMINAL THICKNESS OF INSULATION mm |
NOMINAL THICKNESS OF SHEATH mm |
NOMINAL OVERALL DIAMETER mm |
NOMINAL WEIGHT kg/km |
1 | 2.5 | RE | 0.8 | 1.4 | 6.15 | 62 |
1 | 4 | RE | 1 | 1.4 | 7.5 | 85 |
1 | 6 | RE | 1 | 1.4 | 7.5 | 108 |
1 | 10 | RM | 1 | 1.4 | 8.6 | 155 |
1 | 16 | RM | 1 | 1.4 | 9.6 | 218 |
1 | 25 | RM | 1.2 | 1.4 | 11.1 | 318 |
1 | 35 | RM | 1.2 | 1.4 | 12.1 | 414 |
1 | 50 | RM | 1.4 | 1.4 | 13.7 | 552 |
1 | 70 | RM | 1.4 | 1.4 | 15.5 | 750 |
1 | 95 | RM | 1.6 | 1.5 | 17.6 | 1020 |
1 | 120 | RM | 1.6 | 1.6 | 29.3 | 1259 |
1 | 150 | RM | 1.8 | 1.6 | 21 | 1546 |
1 | 185 | RM | 2 | 1.7 | 23.2 | 1913 |
1 | 240 | RM | 2.2 | 1.8 | 26.2 | 2471 |
1 | 300 | RM | 2.4 | 2 | 29.2 | 3097 |
2 | 1.5 | RE | 0.8 | 1.8 | 10 | 147 |
2 | 2.5 | RE | 0.8 | 1.8 | 10.7 | 179 |
2 | 4 | RM | 1 | 1.8 | 13 | 268 |
2 | 6 | RM | 1 | 1.8 | 14.2 | 337 |
2 | 10 | RM | 1 | 1.8 | 16.2 | 472 |
2 | 16 | RM | 1 | 1.8 | 18.2 | 644 |
3 | 1.5 | RE | 0.8 | 1.8 | 10.4 | 166 |
3 | 2.5 | RE | 0.8 | 1.8 | 11.3 | 212 |
3 | 4 | RE | 1 | 1.8 | 13.1 | 299 |
3 | 6 | RM | 1 | 1.8 | 15 | 402 |
3 | 10 | RM | 1 | 1.8 | 17.1 | 570 |
3 | 16 | RM | 1 | 1.8 | 19.2 | 789 |
3 | 25 | RM | 1.2 | 1.8 | 22.1 | 1141 |
3 | 35 | RM | 1.2 | 1.8 | 24.1 | 1462 |
3 | 50 | RM | 1.4 | 1.8 | 27.6 | 1964 |
3 | 70 | RM | 1.4 | 2.1 | 36.3 | 3635 |
3 | 95 | RM | 1.6 | 2.2 | 40 | 4488 |
4 | 1.5 | RE | 0.8 | 1.8 | 11.6 | 198 |
4 | 2.5 | RE | 0.8 | 1.8 | 12.1 | 252 |
4 | 4 | RM | 1 | 1.8 | 15.1 | 391 |
4 | 6 | RM | 1 | 1.8 | 16.5 | 465 |
4 | 10 | RM | 1 | 1.8 | 18.6 | 702 |
4 | 16 | RM | 1 | 1.8 | 21.1 | 992 |
4 | 25 | RM | 1.2 | 1.8 | 24.2 | 1431 |
4 | 35 | RM | 1.2 | 1.8 | 26.6 | 1861 |
4 | 50 | RM | 1.4 | 1.9 | 30.9 | 2535 |
4 | 70 | RM | 1.4 | 2.1 | 35.1 | 3441 |
4 | 95 | RM | 1.6 | 2.2 | 40.4 | 4691 |
4 | 120 | RM | 1.6 | 2.4 | 44.2 | 5757 |
4 | 150 | RM | 1.8 | 2.5 | 48.5 | 7095 |
4 | 185 | RM | 2 | 2.7 | 53.9 | 8810 |
4 | 240 | RM | 2.2 | 2.9 | 61.1 | 11400 |
5 | 1.5 | RE | 0.8 | 1.8 | 12 | 232 |
5 | 2.5 | RE | 0.8 | 1.8 | 13.1 | 302 |
5 | 4 | RM | 1 | 1.8 | 16.6 | 477 |
5 | 6 | RM | 1 | 1.8 | 18.2 | 618 |
5 | 10 | RM | 1 | 1.8 | 20.3 | 853 |
5 | 16 | RM | 1 | 1.8 | 23.1 | 1212 |
5 | 25 | RM | 0.8 | 1.8 | 26.6 | 280 |
7 | 1.5 | RE | 0.8 | 1.8 | 16.6 | 477 |
7 | 2.5 | RE | 0.8 | 1.8 | 14.1 | 368 |
12 | 1.5 | RE | 0.8 | 1.8 | 16.6 | 475 |
12 | 2.5 | RE | 0.8 | 1.8 | 18.2 | 628 |
14 | 1.5 | RE | 0.8 | 1.8 | 17.1 | 515 |
19 | 1.5 | RE | 0.8 | 1.8 | 18.9 | 648 |
19 | 2.5 | RE | 0.8 | 1.8 | 20.3 | 843 |
27 | 1.5 | RE | 0.8 | 1.8 | 22.6 | 895 |
We are based in Henan, China, start from 2012,sell to Domestic Market(70.00%), Mid East(11.00%), South America(10.00%), Africa(3.00%), North America(2.00%), Southeast Asia(2.00%), Eastern Asia(00.00%), South Asia(00.00%). There are total about 101-200 people in our office.
Always a pre-production sample before mass production; Always final Inspection before shipment.
Wire, Cable
We have twenty years of experience in design and development
Accepted Delivery Terms: FOB,CFR,CIF,EXW;
Accepted Payment Currency: USD,EUR;
Accepted Payment Type: T/T,L/C,Money Gram,Western Union;
Language Spoken: English,Chinese,French
Most quotes are returned within 24 hours
Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;The sheathed average thickness and thinnest point
Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;the sheathed average thickness and thinnest poin;change rate of tensile strength and elongation of insulation and sheath before and after aging;insulated wire core withstand voltage test;hot extension test;ozone resistance test;finished cable flexure test, etc.
The purpose of the performance acceptance test is to verify whether all the performance of the contract products meet the requirements
2.The location of the performance acceptance test is the purchaser’s site
3.The performance acceptance test shall be carried out within 6 months after the 168-hour full load trial operation of the product, and the specific test time shall be determined by both parties through negotiation.
4.Installation of measuring points, primary components and local instruments required for performance acceptance test shall be provided by the supplier and cooperated by the demander. The supplier shall also provide the technical cooperation and personnel cooperation required for the test.
5.Content of performance acceptance test
In accordance with supplier quality assurance and test requirements.
6.Criteria for performance acceptance test
In accordance with supplier's quality assurance and test requirements.
7.The performance acceptance test shall be conducted by the demander and participated by the supplier. The test program shall be provided by the demander and determined after discussion with the supplier. The specific test shall be completed by the testing department approved by both parties.
8.Confirmation of performance acceptance test results
The performance acceptance test report shall be prepared by the testing unit, and the conclusions of the report shall be accepted by both parties. If there is any disagreement between the two parties on the results of the test, the two parties shall settle it through negotiation. If no agreement can be reached, it shall be submitted to the superior departments of both parties for negotiation.
9.When a performance acceptance test is conducted, if a party fails to send personnel to participate in the test after receiving the test notice from the other party, it shall be deemed to have agreed to the acceptance test results.
Refer to the former Ministry of power Industry, Ministry of Machinery Industry issued by the electricity Office (1995) No. 37 "Interim Provisions for the quality supervision of large power equipment", "General representative group working Regulations in large power equipment manufacturers"
Document witness, on-site witness and shutdown pending inspection, namely R point,W point , and H point.
After each manufacturing supervision content is completed, the supplier and the manufacturing supervision representative will complete the signature procedures on the witness form. The supplier shall submit one copy to the demander's manufacturing supervision representative.
R point:The supplier only needs to provide items of inspection or test records or reports, that is, document evidence.
W point:Inspection or test items attended by the purchaser’s manufacturing supervision representative, i.e. on-site witness
H point: When the supplier stops to wait for the inspection or test of the buyer's supervision representative, that is, the project is stopped for inspection.
Upon receipt of the witness notice, the demander shall promptly send a representative to the site of the supplier's inspection or test to participate in on-site witness or stop work for inspection. If the representative of the demander cannot attend on time, point W can be automatically converted to point R, but if point H is not agreed to be converted to point R by written notice of the demander, the supplier will not transfer to the next process and agree with the demander to change the witness time. If the buyer is still unable to participate on time after the change, the H point will be automatically converted to R point.
3.1 The supplier has the obligation to cooperate with the demander's manufacturing supervision and provide relevant information in a timely manner without incurring any costs.
3.2 The Supplier shall provide the demander's supervision representative with the convenience of work and life
3.3 The supplier shall inform the Buyer's representative of the equipment supervision project and time before witnessing the site or stopping work for inspection..
3.4 Demander's supervision representative has the right to check (borrow) the technical information related to the contract supervision equipment. If demander considers it necessary to copy and file, the supplier shall provide convenience.
3.5 The supplier shall provide the inspection and test records and reports to the supervision representative of the demander after the witness.